AV Tools Preventative Maintenance - General

Room Preventative Maintenance Info
  • Preventative maintenance checks are administrative and in-depth technical checks of an AV space.
  • Depending on the complexity of the AV system, these preventative maintenance checks will require between 30 and 90 minutes to complete.
  • Technicians should check for active tickets and should be aware of resolved watch tickets before beginning preventative maintenance on any systems.
  • Troubleshoot (AV Troubleshooting Guide) and correct any issues discovered during a preventative maintenance check.
  • Target timeline - once per academic year per AV system.


Keywords:
avtools av training tooltip 
Doc ID:
98534
Owned by:
EngrIT AV in Engineering IT
Shared Services
Created:
2020-03-09
Updated:
2021-05-07
Sites:
University of Illinois Engineering IT